⚡ SiteCommander Pro
💾 Auto-Saved Locally
= 2178 sq.ft (202.3 m²)
= 353.1 CFT (3.53 Units)
⚙️ Local Dealer Rate Override (Cherthala / Alappuzha Live Market Prices) (Auto-saved in browser)
₹
₹
₹
₹
₹
₹
₹
₹

🔧 Part-Work Quick Estimators Linked to Live Dealer Rates

🛒 Custom Estimate Cart (Auto-Saved)

Items in this cart remain saved in your browser even if you close the tab or restart your phone on site.

Work Item & Specs Qty Amount (₹)
Part-Works Cart Subtotal ₹0

🏢 Whole Residential Building BOQ & Live Material Schedule Effective Rate: ₹2,500 / sq.ft

S.No BOQ Work Category & Description (Live Rate Adjusted) Unit Est. Qty Unit Rate (₹) Share Total Amount (₹)
GRAND TOTAL (FULL BUILDING BOQ — ADJUSTED FOR LIVE DEALER RATES) ₹37,50,000

1. Plot Setbacks (KMBR) & 7.5m Well Rule

Front / Rear Setback
3.0m / 1.5m
Right-Angle Check
3m : 4m : 5m Diag

2. RCC Beam Sizing & 50D Lap Zones

Beam Depth (Span/12)
380 mm (15")
Rebar Weight (D²/162.2)
0.89 kg/m

3. Concrete 1.54× Dry Factor & Water Penalty

Dry Volume for 1m³ Wet
1.54 m³ (54.4 CFT)
Compressive Strength
20.0 N/mm²

✅ Pre-Concreting & Site QA/QC Inspection Checklist (Auto-Saved)

⏱️ IS 456 Minimum Formwork Stripping Time

Structural MemberMin. Stripping Time (OPC)
Vertical sides of Columns, Beams & Walls16 – 24 Hours
Slab Soffits (Props left underneath)3 Days
Removal of Props to Slabs (Span ≤ 4.5m)7 Days
Removal of Props to Slabs (Span > 4.5m)14 Days
Removal of Props to Beams (Span ≤ 6.0m)14 Days
Removal of Props to Beams (Span > 6.0m)21 Days